Specifications include, but are not limited to: Spall repairs, pothole repairs, large crack (> 1” wide) repairs, full depth slab replacement, concrete grinding, and resealing of roadway joints and cracks on SR 404/I-16 and SR 204 in Chatham County, within the limits of the below mile log. This work also includes replacing unstable base material to correct broken or shattered slabs and to include partial-depth removal and replacement of the Portland Cement Concrete roadway surface, usually adjacent to the joint where concrete is spalling. The below detailed estimate is for bidding purposes only. The project starts on SR 404 at MP 149.90 (Chatham County Line) and ends at MP 166.33 (end of SR 404). SR 204 from MP 24.49 to 25.16 (end of concrete at 37th St.), Exit 152 Ramps (SR 17) and Exit 167A Ramp (MLK Blvd) are included in the project. The contractor shall furnish all labor, materials, equipment, means of transportation and incidentals necessary to perform work. All work performed including but not limited to Full Depth Slab Replacement, Patching Portland Cement Concrete Pavement, Pavement Grinding, Traffic Control and Striping will be paid for by the job. Attached is the map for the project stated above.