Specifications include, but are not limited to: MILLING EXISTING ASPHALT PAVEMENT AND INSTALLATION OF 9 INCH THICK FULL DEPTH PCC PAVEMENT IN ALL TRAVEL LANES, PCC JOINT SEALING, LOOP DETECTION RE-INSTALLATION ON SR 7 AND SOUTHWELL BLVD. IN TIFT COUNTY. THE PROJECT BEGINS 470 FT. SOUTH OF JCT SR 7 AND SOUTHWELL BLVD. C/L. AT LOG MILE 0.00 (MM. 6.30) (STA. 0+00) AND ENDING 222 FT. NORTH OF JCT SR 7 AND SOUTHWELL BLVD. C/L. AT LOG MILE 0.131 (MM. 6.43) (STA. 6+92), PROJECT ENDS 174 FT. LT. OF JCT SR 7 AND SOUTHWELL BLVD. C/L., PROJECT ENDS 95 FT. RT. OF JCT SR 7 AND SOUTHWELL BLVD. C/L. INSTALL ALL CENTER LINES, EDGE LINES, HATCHING AREAS AND TRAFFIC MARKINGS AS EXISTING WITH THERMOPLASTIC STRIPING; INSTALL/REPLACE ALL RPMS AFTER THE PCC PAVING OPERATION IS COMPLETE.