Specifications include, but are not limited to: The work to be done consists of furnishing all materials, equipment and labor for the construction of: Division One – Force Main Construction of Force Main A and B including approximately 13,561 L.F. of 12-inch and 3,807 L.F. of 8-inch force main, 100 L.F. of 18-inch and 135 L.F. of 16-inch steel casing by jack and bore, 720 L.F. of 12-inch FPVC by directional bore, 7 vacuum and air release valve with manholes, grassing of disturbed areas and all appurtenances.; Division Two – Gravity Sewer and Force Main Construction of Force Main C and Line A including approximately 7,188 L.F. of 8-inch force main, 175 L.F. of 8-inch FPVC by directional bore, 417 L.F. of 12-inch, 150 L.F. of 15-inch, 2,485 L.F. 18-inch, and 18 L.F. 24-inch gravity sewer, 10 precast manholes, 6 vacuum and air release valve with manholes, and grassing of disturbed areas and all appurtenances. The project includes testing and reinstating approximately 5,870 L.F. of 8-inch force main from Lewiston Road pump station.