Specifications include, but are not limited to: A. Remove existing metal copings. B. Supplement attachment of existing nailers to comply with applicable building code requirements. 1. Replace defective or missing blocking with new to match existing. 2. Provide flat horizontal surface for new coping system. C. Install new self-adhered SBS underlayment, as specified. D. Install new sheet metal standing seam coping with new inside and outside face dimensions to match existing. Slope top surface to drain water to roof side. E. Mechanically fasten existing displaced (i.e. loose and/or out of plane) interior parapet stucco materials. F. Install new Joint Sealants at open joints or cracks in existing interior parapet stucco materials. G. Cover new fastener heads with new Fluid Applied Waterproofing Membrane. Extend membrane minimum 2 inches on all sides of new fastener heads. Provide round, circular shaped membrane cover strips. H. Install new Acrylic Wall Coating at Base Bid repaired parapet stucco surfaces.