Specifications include, but are not limited to: The project is an existing steel pedestrian bridge that is in two sections (60' in length by 8'-7" in width) each.The wood decking has been removed. The bridge is not structurally sound and will require the inspection of existing welds, new welds, additional structural steel, and new guard rails. The successful bidder will need to move the bridge from its current location at Steward Machine Co., Inc., 2431 Airport Rd So., Bainbridge, GA to the Contractor’s fabrication shop. When the bridge is completed, it will need to be transported to the Boat Basin Park and off loaded. The Contractor will be responsible for obtaining all needed Department of Tranportation D.O.T. permits and for meeting all D.O.T. requirements.