Specifications include, but are not limited to: • Construction of a two-story infill connector between the Main Museum and the Museum Collection Building. If sufficient capacity is available on the existing HVAC system to handle the loads for this addition, it shall be incorporated into the existing system. • Construction of a two-story connecting corridor, approximately 21’ along the north side of the Museum Collection Building between the Main Museum Building and the Strickland Warehouse Building. Corridor is to include space for an IT closet (10’ x 10’ minimum) and a fumigation room (roughly 10’ x 16’). If sufficient capacity is available on the existing HVAC system to handle the loads for this addition, it shall be incorporated into the existing system. • Construction of a two-story infill connector between the east end of the Museum Collection Building and Strickland Warehouse Building to include a 10’ x 12’ elevator for collections. If sufficient capacity is available on the existing HVAC system to handle the loads for this addition, it shall be incorporated into the existing system. • Partial demolition and renovation of the western most (narrow) wing of the Strickland Warehouse Building to provide a stand-alone structure for grounds maintenance equipment. This is to include a 7’h x 8’w roll up door and a 48”w hinged door, any necessary masonry or roof structure repair and a new roof. This building will not be conditioned