Specifications include, but are not limited to: This project consists replacing the chiller, making repairs, maintenance, upgrading and commissioning of the building HVAC system, including automation system controls, to improve the air quality for staff, patrons and animals, and to eliminate, to the extent possible, the transmission of air from the kennel areas to the offices and staff workplaces. TASKS: 1. Chiller: Replace existing Chiller in accordance with the instructions below: a. Demolition: i. Remove and dispose of the existing Chiller and related components that will not be reused with the new installation b. New Installation: i. Furnish and install a new air cooled chiller meeting the following criteria (based upon Trane equipment): 1. Air cooled scroll type packaged chiller 2. 70 nominal tons 3. 208/60hz/3 phase 4. High efficiency/performance 5. Full factory refrigerant charge, current standard refrigerant 6. Freeze protection 7. Refrigerant Isolation valves 8. Factory installed flow switch – set point 35cm/sec 9. Std Cooling (42to 65F/5.5 to 18C) 10. Grooved Pipe Connection 11. Factory insulation - all cold parts