Specifications include, but are not limited to: The work to be accomplished consists of furnishing all materials (except as noted below), equipment, personnel, plus performing all the necessary labor to construct the following: Construction of a fabricated metal building for the belt press and sludge loading area with concrete floor and foundation, fiberglass sludge holding tank with mixer piping, grading electrical, HVAC, polymer system tanks and mixer, and all related appurtenances and items of work as required for a complete and functioning system. The Authority has purchased the belt press which is located on site. The contractors scope of work will include installing this on site and existing belt press, which includes a polymer tank, polymer tank mixer, and polymer chemical feed pump. . Cedartown