Specifications include, but are not limited to: 1.Owens Road – Approximately ½ of this roadway will receive FDR treatment with remainder receiving a 1” overlay of OGI and the entire road will receive a 2” overlay of 12.5 mm SP.2.Magnolia Hills – Entire subdivision (see map on following page for work location) will have underdrain placed behind or under curb as directed by CC Engineering. Entire roadway will receive FDR treatment with an application rate of 50 lbs/sy of cement and topped with 2” of 12.5 mm SP with raised edge, asphalt curb, to match existing. 3.Louisville Rd. from Columbia Rd to Wrightsboro Rd. - Deep patching utilizing FDR as directed by CC Engineering. Entire road to receive 1” of OGI and 2” of 12.5 mm SP. 4.Old Louisville RD from Louisville Rd. to Gordon Hwy. - Deep patching utilizing FDR as directed by CC Engineering. Entire road to receive 1” of OGI and 2” of 12.5 mm SP.