Specifications include, but are not limited to: 3.1.1 Asphalt paving, striping, and associated work on specified City street within 45 consecutive calendar days from NTP (notice to proceed) and shall include all labor, materials, and incidentals necessary to construct the project. A preliminary list of streets will be included in the bid packet. The amount of work may increase or decrease, and the preliminary list of streets are subject to change. This project includes some GDOT LMIG funding. The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation as amended herein, shall govern the construction of this project. 3.1.2 For resurfacing, clean, tack and overlay each listed street with 1.5” thick layer of pave topping material, per each individual as identified street specification at a total lump sum cost. 3.1.3 All warning and advance signs are to be in place alerting motorist of street resurfacing activities at all times. Temporary reflective tape shall be use on each individual listed street 3.1.4 Have designated certified flagging personnel present on site at all times actively directing traffic.