Loading...
Skip to main content
< Back to results

181 HANARRY DRIVE & 821 BLAKE COURT STORM DRAIN SYSTEM REPLACEMENT


Location
Georgia
Publication Date
06/11/2019 01:04 PM EDT
Closing Date
07/17/2019 03:00 PM EDT
Issuing Organization
City of Lawrenceville
Solicitation Number
Description

Specifications include, but are not limited to:  Demolition and removal of existing 18” - 54” CMP storm drain pipe system.  Replace & Install new RCP & HDPE 18”- 54”Pipes and tie-in to existing structures  Install complete 24" curb & gutter.  Installation of sod/mulch on areas disturbed by construction activities including erosion control.  Re-grout all exist. structures & site clearing.  The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications.  Installation of erosion control BMP’s  All work shall comply with all Federal, State, and local requirements and specifications.  The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids