Specifications include, but are not limited to: Demolition and removal of existing 18” - 54” CMP storm drain pipe system. Replace & Install new RCP & HDPE 18”- 54”Pipes and tie-in to existing structures Install complete 24" curb & gutter. Installation of sod/mulch on areas disturbed by construction activities including erosion control. Re-grout all exist. structures & site clearing. The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications. Installation of erosion control BMP’s All work shall comply with all Federal, State, and local requirements and specifications. The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project.