Project consists of the roof demolition down to existing roof deck among three downtown spaces. The project requires bringing the roofs up to the current energy code and creates a new R25 roof system, RS01, with new 5/8" gypson cover board, vapor barrier, 4.5" of Polyiso continuous insulation and a new TPO roof membrane. New internal roof drains with overflow drains have been added to 120 and 124 S. Cherokee. New tapered insulation will be used to slope to the roof drains. There are some areas with significant water damage to the existing roof deck where structural has called out for a new 1/2" plywood to replace the damage wood planks. Additionally all existing roof skylights are proposed to be demolished and enclosed with the new roof system.