2.2.1 The Scope of Services to be performed by the Contractor, including but not limited to adherence to and compliance with the specifications and terms stated herein, shall be subject to the review, approval and acceptance of the Project Manager engaged by the City of Commerce, Georgia hereinafter referred to as the “Project Manager.” 2.2.2 The Contractor hereby agrees to perform the work as an independent Contractor, and not as a subcontractor, agent or employee of City of Commerce Georgia. 2.2.3 The painter shall mix, thin and apply each coating at the rate and manner specified by the manufacturer's printed instructions. Deficiencies in film thickness shall be corrected by the application of an additional coat(s) of paint. 2.2.4 All coatings shall be applied in strict accordance with the applicable manufacturer's current printed product data sheet(s) and container labels. Coatings shall not be applied above or below the minimum and/or maximum surface temperatures as stated on the product data sheet(s) and shall not be applied to wet or damp surfaces, in rain, snow, fog or mist. Surface temperature must be at least 5°F above the dew point. 2.2.5 Painting shall be completed well in advance of the probable time of day when condensation will occur and/or the surface temperature is expected to drop below the minimum listed on the applicable product data sheet(s). 2.2.6 Finish coats shall be uniform in color and sheen without streaks, laps, runs, sags or missed areas. 2.2.7 The manufacturer's recommended curing time shall elapse before the next coat is applied. Adequate ventilation shall be provided for proper drying of paints on interior tank surfaces. A minimum of 7 days following the application of the final coat on the interior surfaces shall be allowed before the tank is flushed, disinfected or filled with water. 2.2.8 Clean-Up: All cloth and waste that might constitute a fire hazard shall be placed in closed metal containers or destroyed at the end of each day. Upon completion of the work, all staging, scaffolding, and containers shall be removed from the site and/or destroyed in an approved and legal manner. Paint spots, oil, or stains upon adjacent surfaces and floors shall be completely removed. 2.2.9 The work of the Contractor shall be subject at various stages during the performance of the Scope of Services to inspection, review and approval of the Project Manager. Upon completion of the Scope of Services, final approval of the Project Manager of the work shall be required.