Work to be done shall include furnishing all products and equipment and performing all labor necessary to construct the following: installation of approximately 13,555 L.F. of 12" PVC Water Main, +/- 1,083 L.F. of 8" Water Main, +/- 167 L.F. of 6" Water Main, +/- 100 L.F. of Jack & Bore 20" Steel Casing to be installed in Norfolk Southern Rightof-Way, +/- 328 L.F. of Jack & Bore 18" Steel Casing in GDOT Right-of-Way, +/- 62 L.F. of Jack & Bore 12" Steel Casing in GDOT Right-of-Way, installation of new fire hydrants, pressure reducing valve, water service transfers, valves, plugging and abandonment of existing water mains, and all other appurtenances necessary to complete the project in accordance with the Technical Specification and Construction Drawings.