Scope of Work: • Walls o Frame and construct new walls per specified dimensions. o Install drywall, finish, and paint as required. • Flooring o Install new flooring throughout all offices, hallway, bathroom, and kitchen. o Flooring type to be determined (e.g. vinyl, tile, etc.). • Ceiling Tile System o Install suspended ceiling grid system with acoustic ceiling tiles in the lobby area and new office, hallway, bathroom, and kitchen. o Ensure integration with lighting and HVAC as needed. o The ceiling tile coverage is expected to match the total floor area (≈910 sq ft), pending any soffits or exclusions. • Electrical o Install four (4) new wall sockets in each office and one hallway. o Verify outlets meet code requirements for spacing and capacity. • Windows o Remove two (2) windows o Install one (1) new window in Office 1, size and style to be confirmed by the project owner.