Technical Specifications 1. SITE PROTECTION 1.1. Protect all gymnasium flooring with appropriate drop cloths or plastic sheeting securely taped at edges. 1.2. Protect all basketball hoops, scoreboards, light fixtures, electrical outlets, switches, and other fixtures with plastic sheeting or masking materials. 1.3. Protect all windows, doors, and door frames with appropriate masking materials. 1.4. Protect all HVAC vents and returns. 1.5. Remove or protect any movable equipment as directed by the facility manager. 2. CEILING PREPARATION 2.1. Surface Repair: 2.2 Inspect ceiling for any structural damage, holes, or cracks 2.3 Repair as needed with appropriate patching compound 2.4 Sand patched areas smooth and flush with existing surface 2.5 Remove any loose or peeling paint Final Surface Preparation: 2.6 Clean all surfaces free of dust, dirt, grease, and debris 2.7 Wipe down entire ceiling with tack cloth or damp rag to remove all dust from remediation process 2.8 Ensure surface is clean, dry, and ready for primer application 3. WALL PREPARATION 3.1. Inspect walls for holes, cracks, gouges, or other surface defects. 3.2. Repair all defects with appropriate patching compound. 3.3. Sand all patched areas smooth and flush with existing surface. 3.4. Remove any loose or peeling paint. 3.5. Clean all surfaces free of dust, dirt, grease, and debris. 3.6. Caulk gaps between walls and trim, walls and ceiling, and other joints as needed. 3.6. Establish and mark horizontal break line at 10 feet above finished floor for two-tone paint application. 4. HANDRAIL PREPARATION 4.1. Inspect all handrails for rust, corrosion, loose paint, or surface defects. 4.2. Remove all loose, flaking, or peeling paint using wire brush, scraper, or sandpaper. 4.3. Sand metal handrails to remove rust and create proper surface profile for paint adhesion. 4.4. Clean all handrails thoroughly to remove dust, grease, oils, and debris. 4.5. Wipe down with appropriate solvent or degreaser as needed.