1. Site Preparation o Perform necessary prep work, including identifying trees for removal, verifying access points, and ensuring public safety and traffic control measures are in place. 2. Tree Cutting and Removal o Cut and remove designated trees within the specified project boundaries. o Use appropriate equipment and methods to ensure minimal disruption to the surrounding environment and infrastructure. 3. Stump Grinding o Grind stumps to a level at or below the existing grade, as specified by the City. o Backfill and level the area to ensure safe conditions post-removal. 4. Debris Removal o Remove and dispose of all debris (e.g., branches, wood chips, mulch) in accordance with local regulations. o Keep the work area free of debris throughout the project to maintain safety and cleanliness. 5. Site Cleanup o Restore the site to a clean, safe, and orderly condition upon completion of work. o Ensure any damage to surrounding areas is repaired to the City’s satisfaction. 6. Traffic Control o Implement traffic control measures as required to maintain a safe environment for the traveling public and project personnel.