Shop Building – TPO Overlay Project (Scope of Work): • Provide and install all required/necessary materials, supplies, labor, equipment, machinery, etc. for a complete TPO overlay project, per the scope of work. • Remove the existing metal rake trim, flashing, and gutter/downspouts (as required). • Provide and install 3” EPS flute fill insulation between the existing metal panel ribs. • Provide and install one layer of 1” polyisocyanurate insulation (cover board) over the EPS flute fill. • Mechanically attach one layer of 60 mil TPO membrane with welded accessories (Rhino Bond System) per the Manufacturers’ recommendations. • Provide and install new metal trim & flashings & gutters & downspouts (as required). • Provide and install new pipe boots, caulking, and sealants (as required). • The color for the new TPO roof membrane = White. • The color for all the new metal trim & flashings & gutters & downspouts = Bronze. • All work shall be coordinated with Troup County Staff. • All work shall comply with the applicable Building Codes. • Provide a copy of all manufacturers’ product warranties (20-year warranty) and the contractor’s written warranty covering all labor, installation, and workmanship. • Clean-up & dispose of all construction debris and/or trash. • Contractor shall sweep the jobsite with a magnetic wheel to remove loose screws from the job site. • Protect surrounding areas from damage & debris. • Troup County (owner) is responsible for any/all permit requirements.