The following field surveying services are required in the areas described above. Deliverables include data files electronically in AutoCAD 2018 format, original field book and three full-sized paper copies of the completed survey signed & sealed by a Registered Professional Land Surveyor licensed in the State of Georgia 1. Establish horizontal and vertical control for the project area. Horizontal datum shall be based on the Georgia State Plan, East Zone, and NAD83. Vertical datum shall be based on NAVD88. Provide a minimum of three (3) NGS B-order (or higher) station shall be connected for the horizontal network and minimum three (3) third-order (or higher) bench marks shall be connected for the vertical network in accordance with Rule 180-7-.04(2) of the Rules and Regulations of the State of Georgia - Department 180. The locations shall be coordinated with the JWSC. Survey control maps, ASCII point files and copies of survey field notes will be provided. 2. Locate all property corners, easements and road and railroad right-of ways. Provide name(s) of property owner(s), parcel ID numbers, etc. in those areas affected by the work. 3. Provide boundary and topographic survey of entire proposed project area. Provide cross sections with spot elevations at a maximum grid interval of 100-foot. 4. Locate R/W and all visible improvements such as building, fences, permanent signs, sidewalks, curb and gutter, edge of pavement, driveways, mailboxes, and other structures within 10 feet outside the right-ofway line, if accessible. For parcels with structures, include final floor elevations of main structures. 5. Locate existing water lines (if any) with pipe sizes, water meters, valves, vaults, fire hydrants, etc