Sealed bids will be received by the Town of Pine Mountain for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for construction of the Sullivan Circle Drainage Project in the Town of Pine Mountain, Georgia. The Project consists of, but is not limited to the following major elements: Demolition of 87 LF of 15” CMP pipes and structures Sawcut and remove/replace 45 square yards of asphalt roadway Sawcut and remove/replace of 61 square yards of concrete driveway Abandonment of +/- 60 LF of 12 inch and 15-inch CMP storm sewer pipes, including placing flowable fill into the pipe segments Installation of 282 LF of 15-inch RCP, 65 LF of 18-inch RCP and 63 LF of 24-inch RCP storm sewer pipes and structures Grading needed for ditches, swales and tie in slope Installation of permanent grassing and sod in certain areas Project will also include traffic control and erosion sedimentation and pollution control installation and maintenance through the duration of the project.