The work shall include the construction of improvements at an existing intersection along St. Marys Road, at approximately stations 42+82.58 to 64+16.12, which includes widening to accommodate right and left turn lanes for an associated new roadway, Esplanade Blvd, pavement removal, milling & resurfacing, and pavement overbuild for slope correction, and maintenance of traffic along an approximately 0.4-mile stretch of St. Marys Road between Interstate 95 and Osprey Cove Subdivision. Work also includes modifications to existing drainage structures within the right-of-way, new drainage structures and piping, re-grading of existing roadside swales, roadway striping and signage, sodding/grassing, erosion, sedimentation and pollution control, maintenance of traffic, and miscellaneous appurtenances. More specific details are in the Specifications and Contract Documents.