The project is an interior renovation to the existing Bus Garage building. Select improvements in the office wing of the Bus Garage encompass the following spaces: Dispatch, Operators' Room, Corridor, Supply Room, Resident Manager's office and Reception, Men's Toilet and Locker rooms, current Superintendent's office, and the maintenance Shop. The proposed scope of improvements includes: adding a new Foreman's office, converting an existing office into a meeting room and a break room with kitchenette, replacing employee lockers, and generally upgrading the above spaces with new lighting and ceilings, repair or replacement of flooring, new covers for convectors and painting. The scope also entails associated electrical (distribution &/or devices) and plumbing work in the spaces being renovated. The renovations will take place while the facility remains in normal operation, which will require specific sequencing of the work and restrictions on when work can be performed in specific areas, especially the Dispatch/Operators' rooms, the maintenance Shop and Toilet-Locker Room spaces. Sequencing and work restrictions and coordination of these requirements for construction are described on drawing sheet A1. More specific directions will be provided by the Owner prior to construction. No additional specifications were given.