Specifications include, but are not limited to: 1. All work is taking place at active fire stations. Special working conditions and restrictions may apply. Dekalb County reserves the right to orchestrate work in cooperation with the contractor to minimize impact to normal County operations. Blocking of entrance doors and bay doors can only occur on a limited basis at pre-specified times to be coordinated with onsite staff. 2. All work at all stations shall be completed within 270 days from the date of the Notice To Proceed. 3. The six fire stations have two different types of roofs. Station’s 4, 6 & 25 have an existing ballasted EPD roof system. Stations 18, 19 & 20 have built up roofing. Contractorshall remove roofs and insulation down to building structure. 4. Roof Replacement shall include: • Cleaning existing roof of all debris • Installation of new half (1/2) inch recovery board • Installation of new 0.60 mil PVC flat roofing system • Installation of new flashing and new termination bars • Installation of drip edge at gutter edges • Installation of new gutter and downspouts as required