1. Removal of Existing Ceiling System • Carefully remove the existing ceiling grid and tiles. • Properly dispose of all removed materials in accordance with applicable regulations. • Protect existing HVAC, electrical, and fire protection systems during removal. 2. Installation of New Ceiling System • Supply and install a new 2x2 ceiling grid system that meets industry standards and project specifications. • Supply and install new ceiling tiles per the approved specifications. • Ensure proper alignment, leveling, and secure installation of all ceiling components. • Accommodate existing HVAC vents, lighting fixtures, and other ceiling-mounted elements. 3. Compliance and Coordination • Perform all work in compliance with applicable building codes, safety regulations, and industry standards. • Coordinate with the owner’s representatives and other contractors to minimize disruptions to facility operations. • Conduct quality control inspections to verify proper installation and finishing. 4. Site Cleanup and Final Inspection • Remove all construction debris and materials from the site. • Conduct a final walkthrough with the owner’s representative to confirm satisfactory completion. • Address any deficiencies prior to project closeout.