Specifications include, but are not limited to: Phase 1 Core Lab, Hematology, Genetics Lab, & specimen receiving Grady has purchase a new Automation line and intends to place this new automation line within the Northward edge. To prepare for this transformation the space will receive a full gut renovation from the Northward edge all of the way to the interior circulation corridor. New space will be rebuilt to the concept plan shown installing OPCI utility walls to allow critical utilities to be brought to the testing areas and OPOI benching will connect along the length of the walls. Phase 2 Molecular testing, Microbiology, and BSL III labs Once the new automation line has been brought into use and validated Grady intends to remove the existing line automation and vacate the Southward section of the hospital lab. This space, like Phase 1, will receive a full gut renovation from the building edge all of the way to the interior circulation corridor (less existing microbiology lab. New space will be rebuilt to the concept plan shown installing OPCI utility walls to allow critical utilities to be brought to the testing areas and OPOI benching will connect along the length of the walls.