Specifications include, but are not limited to: furnishing all labor, materials, tools, equipment, safety equipment, permitting, traffic and pedestrian control, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Cleaning sanitary pipes and CCTV inspection along existing Perry Branch Gravity Sewer trunk main. The work shall include cleaning and CCTV inspection of approximately 259 L.F. of 10” PVC pipe, 1,657 L.F. of existing 12” PVC pipe, 6,300 L.F. of existing 12” DI pipe, 639 L.F. of 12” clay pipe, and 41 existing manholes. The purpose of this project is to locate interconnections and services for replacement of the existing gravity sewer system. The deliverable shall include all video and inspection reports inclusive of the work.