1. Scope Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Pavement Preservation and Maintenance Services at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The cracks shall be properly sealed from edge of pavement to edge of pavement to include shoulders, Center Turn lanes, Left turn laned, right turn lanes, and Side roads to the back of the radius for the length of the project. Removal of RPMs from the roadway and the disposal of RPMs in and approved manner will be 50% of the RPM line item in Table 12.