Demolition includes: S1 - Wood-framed house (1780±SF) with vinyl siding over asphalt siding on CMU (2-5 course) surround with crawlspace. Shingle roof with rear (120±SF) rolled roof area. Front and rear concrete porches (374± & 120±SF), septic system, and one well. Interior contents are estimated to be ≤10 yd3 volume., Vehicle Tires: Total of 12± automotive tires are found within (or the vicinity of) the five (5) structures or four (4) Miscellaneous Items included with Parcel 91. MI1 - Remove - Front crafted mailbox stand, other metal devices crossing ditch, walkway over ditch to include concrete culvert pipe, metal handrails, etc., and a 22’x3.5’ walkway constructed of concreted pavers. Pavers are largely covered in soils. Remove all associated materials from drainage ditch. MI2 - Wood-frame pergola consisting of four (4) 4”x4”x7’6” posts set in concrete. Posts are boxed at top with two (2) 2” x6”x10’3” & two (2) 2”x6”x5’9” boards. Box topped off with seven (7) 2”x6”x8’ decorative boards. Also, remove 80±LF of stones (from ROW) surrounding trees and landscape islands around residence...