A. Evaluate existing lighting systems and determine what components, if any, should be retained for use in the proposed lighting system. B. Prepare and provide a set of lighting construction plans to be included in GDOT’s Roadway plans for letting. This will entail producing: 1. A summary of itemized quantities. 2. Plan sheets, at same scale and unit of measurement as GDOT proposed roadway plans. 3. Provide manufacturer name, model number, and cut sheets for all luminaries used in the design. 4. Foundation designs, if required. 5. Special details, if required. 6. Schematic diagrams. 7. Single line diagrams. 8. Special Provisions. 9. All applicable Georgia Standards and Construction Details. 10. Provide a Luminaire/Pole Data Legend Sheet including: a. Circuit number. b. Roadway station and offset. c. Luminate wattage and type. d. Mounting height. e. Mounting arrangement. 11. Pole and service point locations. 12. Utility owner, address, and contact person with specific connection information.