Conduct a thorough site inspection before beginning any work. Coordinate with City staff to minimize disruption to ongoing aquatic center operations. Maintain a clean and secure worksite throughout the duration of the project. Comply with all OSHA safety standards and applicable Georgia building and environmental codes. Ensure that the Lazy River meets the specified hydraulic performance requirements: Required Flow Rate: 438 gallons per minute (GPM) Turnover Time: Maximum 2 hours Complete all work in time for final inspection and operational readiness no later than May 1, 2026. Option A – Replace Lazy River Lining The contractor shall: Demolition and Surface Preparation Safely remove and dispose of the existing liner in accordance with environmental and disposal regulations. Inspect the underlying surface (gunite/concrete) for cracks, wear, or structural damage. Repair any structural defects or cracks using industry-accepted materials and techniques. Installation of New Lining System Provide and install a commercial-grade, pool-safe liner suitable for high-use, public aquatic facilities.