Specifications include, but are not limited to: General Scope Notes: • BA003 • Demolish and renovate unused toilet room BA003 to be part of expanded Break Room BB018. • BA002 • Renovate locker room BA002 to reduce size for expanded break room BB018 (remove double sided locker aisle) • Wall lockers located on demoed dividing wall to be relocated onto new dividing wall • Replace and repair ceiling tiles and grid as needed. • Patch and match paint • Relocate lighting and air supply/returns to maintain code complying levels in the locker room • BB018 • Renovate and expand breakroom BB018 with new finishes: flooring to receive standard LVT, paint, new ceiling tile & grid throughout, replace lighting with new LED standard. Include new kitchenette casework with sink. • Add FFE to room BB018: 2 new full size refrigerators, 2 new microwaves, combination ice / water dispenser and 4-person breakroom style tables/chairs to match standard (as many as will fit) • Relocated existing FFE in room BB018: 2 cable televisions, keurig coffee maker and vending machine.