This includes approximately 561 LF of 8” ductile iron (D.I.) water main, 300 LF of 1” copper service line installed via directional bore (long side), and 25 LF of 1” copper short side service. The work also includes furnishing and installing an 8” tapping sleeve with valve and box, a 22.5° D.I. bend, an air release valve with sample tap, and a complete fire hydrant assembly with 37 LF of 6” hydrant lead. Additional tasks include capping and abandoning an existing water main, closing a valve and removing the stem, returning one existing hydrant to the owner, and capping an existing hydrant lead. The contractor shall also connect 11 services to existing meters and furnish water main accessories (196 lbs.), along with completing pressure and bacteriological testing. Roadway restoration includes 6 SY of asphalt driveway, 21 SY of concrete driveway, 55 SY of asphalt pavement replacement, and 68 LF of curb and gutter replacement.