1. The extent of the project along Harris Drive begins at the intersection of Main Street and runs south 680 feet to the end of Harris Drive. 2. Proposed work will include 5 feet of sidewalk connecting with Main Street along the west side of Harris Drive. 3. Pavement width of Harris Drive will be increased to 22 ft up to the intersection of the Veterans Park entrance. 4. Relocation of the existing 6-inch water line, and includes a new fire hydrant assembly on Harris Drive. This is located at the rear of 480 Main Street. 5. Stormwater infrastructure/inlet will be replaced at 123 Harris Drive. 6. Approximately 12 Cherry Blossom Trees will be planted on the west of Harris Drive, along the sidewalk, into the park site. 7. Milling and paving of remaining road surface.