Specifications include, but are not limited to: Remove all flat floor plates, strip and clean floors. furnish all new screws and anchors to concrete. This is a floating sysatem, therefore, the plates can't be attached to the maple. After plate removal, cut 1 1/2 in void (expansion) per Action Floor System specs) around the gym floor and cut 1/2 in around all door jambs. Resand the entire gym floor, apply 2 coats of penetrating sealer, buffing between coats. Apply all game lines and logos back as before. After paint has completely dried, apply 2 coats of heavy duty gloss Polo Plaza MFMA finish. After completion of entire gym floor, anchor the reconditioned metal plates to the floor. Once job is complete, provide a warranty for materials and labor for one year from date of completion.