• Develop Owner’s Project Requirements (OPR) per the ASHRAE Standard 202-2018 • Review Owner’s Project Requirements for completeness and clarity • Review the DP’s Basis of Design (BOD) information and ensure consistency with OPR. The OPR should contain the following items: general project information (size and schedule), training operations and maintenance requirements, building space and occupancies summary, and building performance criteria (energy, materials and resources, and indoor air quality). Sample OPR Guidelines and Outline are provided with this RFQ, see Exhibits D and E. The BOD information will be used to satisfy the OPR. The BOD should include an overview of building systems, summer and winter design conditions (interior and exterior), HVAC system selection, utilities, lighting, code and life safety requirements, budget and special systems (pure water, air, etc.)