Demolish, remove, and dispose of all buildings, building components, & appurtenances, furniture, fixtures & equipment, utility lines (i.e. communication, fire, gas, grease, power, sewer, & water), gravel, asphalt millings, asphalt & base, concrete & reinforcement, bollards, railing, & fences except as noted on the plans. 2. Terminate, cap, and preserve all service lines (i.e. fire, sewer, and water) at the meter, valve, or property line. 3. Dispose of all hazardous materials according to federal, state, and local laws. 4. All Erosion and Sedimentation Best Management Practices shall be installed per the GSWCC Manual for Erosion and Sediment Control in Georgia - 2016 Edition. 5. Prior to starting any demolition operations, install around entire property: a. Sd1-S - Silt Fence - Sensitive 6. As demolition begins, install: a. Co - Construction Exit