Demolition and Removal: · Remove and dispose of existing gutters and downspouts. · Remove and disposal of wall sheeting on the front of the building. · Remove and replace overhead and personnel door trim. · Remove existing window air conditioning unit. · Remove existing wall exhaust fan and surrounding wood framing. Building and Panel Work: · Furnish and install 26-gauge colored wall panels on the front of the building. · Furnish and replace overhead and personnel door trim. · Perform wall sheeting repairs on the remaining three sides of building as needed. · Allowance for wall insulation. · Furnish and install two (2) new peak boxes. · Furnish and install new gutters and downspouts. · Install downspout elbows at the front of the building. · Install a transverse pipe at the rear of the building to collect gutter runoff and route water to end of the building. · Install one framed window opening and hang a single-hung window in the office. Painting: · Treat overhead and personnel doors with rust inhibitor, prime, and paint. · Paint the exterior of the pre-engineered metal building to match new front panels. · Additional Structures: · Install a new five-foot overhead brace canopy or similar awning structure over the front door. HVAC & Ventilation: · Furnish and install two (2) mini-split HVAC units (one for office, one for storage room). · Install one (1) 48-inch exhaust fan with gravity dampers. Electrical: · Furnish and install all electrical connections required for HVAC units and exhaust fan. Site Work: · No site work is required. Contractor Requirements · Contractor must furnish all labor, materials, tools, and equipment necessary to complete the work. · Contractor must be licensed and insured to perform work in the State of Georgia. · Contractor is responsible for all permits and inspections as required. · Work must be performed in compliance with all applicable codes and safety standards.