Only those pay items identified in the bid schedule, or added by Addendum or Supplemental Agreement, will be measured for payment by the units listed in the bid schedule and/or supplemental agreement and paid for at the Contract prices. The cost of all Work not directly covered by the pay items shall be considered incidental to the construction and is to be included and distributed among the bid unit prices of the pay items listed in the Contract. Contract unit prices represent the installed, complete-in-place, tested and accepted cost, including, but not limited to: * All required labor, tools, and equipment, unless otherwise noted. * All materials, unless specifically noted to be furnished by the Owner or by others, or specifically identified for payment under another pay item. * All required excavation, dewatering, thrust blocking, rodding, sheeting/shoring/bracing, backfill, compaction and restoration to grade, and testing. * All required normal traffic control. * Acceptable bedding as detailed, specified, or as required by conditions encountered. * Disposal of all surplus or waste materials, unsuitable materials, and debris. * Protection of existing utilities, including but not limited to locating, diligent care in handling and working around, relocating, and repairing. * Miscellaneous associated work necessary to complete the work in place. * Minor meter, meter box, and valve box adjustments. * All temporary taps necessary for sterilization and testing. * Minor manhole adjustments. * Preconstruction staking. * Coordination of additional project access as may be desired. * Project Record Drawings