A. Preparation of Project concepts, alternatives, and reports: 1) Development/Verification of Project Logical Termini. 2) Define Concept. 3) Review Environmentally Sensitive Areas (ESAs). B. Preparation of public hearing and/or public information meeting displays and materials: 1) Research property boundaries. 2) Research property owner names. 3) Public Involvement activities. C. Preparation of mapping and property database, including, but not limited to, the following: 1) Aerial photography. 2) Field survey. 3) Photogrammetric mapping. 4) Cartography. 5) Digital Terrain Models (DTM). 6) Location of utilities. 7) Production of existing Right-of-Way (ROW) and property line map, and processing of field enhancements for map models. D. Hydrologic and hydraulic analysis and design of hydraulic systems: E. Development of Environmental documents. F. Preliminary Roadway design and plans: 1) Constructability review. 2) Establish Design data.