The installation of a center-hung scoreboard in the basketball arena involves the placement of a suspended, multi-sided display system directly above center court to ensure optimal visibility for all seating areas. The process will include the following key steps: Structural Assessment and Preparation: A thorough evaluation of the arena’s roof structure is conducted to verify load-bearing capacity and ensure compliance with engineering and safety standards. Reinforcements or additional rigging points may be installed as needed. Rigging System Installation: A certified hoist and rigging system is mounted to the structural supports. This system will allow for safe lifting, lowering, and positioning of the scoreboard for maintenance and events. Scoreboard Assembly: The scoreboard, typically featuring four LED video panels, is assembled on-site or lifted in preassembled segments. Each panel displays game stats, video replays, advertisements, and real-time information. Electrical and Data Integration: Power and data lines are run to the scoreboard and integrated with the arena's control room and scoring systems. Testing and Calibration: Once the scoreboard is in place, full operational testing is conducted to verify structural stability, visual clarity, control system functionality, and safety compliance. Final Commissioning: Upon successful testing, the system is turned over to arena operations staff with training provided for daily operation and maintenance protocols