Specifications include, but are not limited to: THE PROJECT consists of furnishing all materials and equipment and performing all labor necessary to construct the proposed Dawson Forest Phase I Upgrade and Expansion to 1.25 MGD as set forth in the bid, as shown in the drawings and as specified. The project generally consists of the following major components of work and appurtenances: a. Modifications and upgrades to the existing Influent Pump Station; b. Construction of a New Influent Recycle Manhole at the existing Influent EQ / Emergency Storage Pond; c. Construction of a new Post EQ Tank and Pump Station; d. Construction of new Effluent Disk Filters; e. Construction of a new UV Structure; f. Construction of a new Effluent Parshall Flume and Cascade Structure; g. Construction of a new NPDES Outfall; h. Installation of bulk Liquid Lime and Alum Feed Facilities; i. Installation of a new Reuse Water System; j. Miscellaneous piping upgrades and modifications; k. Electrical and instrumentation upgrades and modifications; and l. Related equipment and appurtenances as detailed in the Specifications and as shown on the contract drawings.