Specifications include, but are not limited to: 1. Roof a. Repair metal as needed b. Replace PVC flat roof c. Replace gutters and downspouts *ALTERNATE* 2. 2. Flooring a. Carpet – 4,500 SY – replace with standard *ALTERNATE* b. Quarry Tile – 6,950 SF *ALTERNATE* i. Kitchen area may require additional remediation due to leaking drain pipes and floor settling c. Terrazzo – 10,250 SF – Various repairs d. Sealed Conc. – 1,130 SF – NIC e. VCT – 1,250 SY – replace with LVT *ALTERNATE* f. Wood (gym) – 7,600 SF (refinish only) *ALTERNATE* 3. Wall Coverings a. Paint all doors, frames with standard (Urbane Bronze) i. Some door frames (mainly kitchen area) need to be repaired or replaced b. Paint all walls (Navajo White) *ALTERNATE* i. Selective murals to be marked by school to remain; most will be painted over c. Paint or repair exterior canopy metal columns, etc. 4. Ceilings – replace all ACT throughout a. ACT – 61,150 SF b. Moisture resistant ACT – 7,500 SF c. Fire Rating Layer (2nd layer above visible ceiling) – 29,100 SF (may need to reevaluate this with fire marshal) d. Metal Panels – 300 SF NIC 5. Accessories a. Replace room signage *ALTERNATE* b. Replace bathroom partition doors *ALTERNATE* 6. Plumbing Upgrades a. Replace lavatory faucets (replace entire sink assembly in boys/girls) b. Replace flush valves c. Replace water fountains (with bottle fill) – some have been replaced *ALTERNATE* 7. HVAC a. Replace 44 wall hung gas units b. Replace 40 pad mounted air conditioning units c. Replace 15 thru wall heat pumps d. Replace 4 electric heaters e. Replace 38 exhaust fans f. Replace 2 remote condensing units g. Replace 2 duct furnace units h. Replace gym (existing equipment type unknown) – replace all duct with internally lined paint grip duct to be painted Urbane Bronze i. Add conditioning to hallways with mini-split in MDF room (removes need for replacement electric unit heaters) i. Egg crate returns in ceiling for warmth in attic in winter 8. Kitchen *ALTERNATE* a. Some piping shows corrosion b. Possible mold issue with moisture in the dish washing area c. Floor drains have settled and floor has areas of standing water where drains are above floor level d. Freezer area needs to be repaired, including leaking chiller unit e. Electrical boxes at serving line are too high and being knocked causing them to be loose—need to replace and inset in floor f. Drains at serving area are too high and not used – allows smells out; need to cap/ recess 9. Life Safety/Low Voltage – lock all in one MDF room a. Intercom *ALTERNATE* b. Fire Alarm c. Security *ALTERNATE* d. Fiber (IT) *ALTERNATE* 10. Generator (tie together with 7) *ALTERNATE* 11. Lighting – replace all with LED a. Interior b. Exterior 12. Site a. Paving *ALTERNATE* i. Repair – 6,200 SY; assume 10% subgrade repair ii. Seal Coat – 8,500 SY iii. Crack Seal – 5,000 SF iv. Striping – 1,250 LF; Markings – 200 SF, Parking Lines – 3,200 LF b. Pressure wash sidewalks