The Base Bid work to be performed consists of site general, electrical rehabilitation/replacements for existing Wells No. 1 and No. 5 that includes site fencing, painting, minor civil improvements, replacement of the existing electrical and control components, replacement of the incoming service entrance breaker and surge protection devices, replacement of the existing Motor Control Centers (MCC’s) with intelligent soft starters for the well pumps, replacement of the existing MCC cables between the Georgia Power Transformers and MCC’s, new portable generator connection box, new polemounted light fixture for each site and integration of the existing magnetic meter and other instruments into the Water Treatment Plant’s existing SCADA system. All work shall be constructed as described in the Technical Specifications and as shown on the Drawings, complete, tested and ready for operation. Contract Documents and additional available information are open for public inspection at the following location: Utility Department, City of Valdosta, 1016 Myrtle Street, Valdosta, GA 31603.