Specifications include, but are not limited to: Contractor proposals received for this project should include all related costs to achieve the existence and functionality of a new access control system. Contractor costs should include all requisite labor, equipment and material costs to: 1. Run required plenum-rated cable and conduit; patch wall penetrations with fire retardant 2. Install any control boards, panels, boxes, and readers necessary 3. Install and configure required software 4. Remove all existing control boards, boxes, panels, etc. no longer in use after installation 5. Provide and install front-end computer with capability to contain and control access system; include 21” monitor and printer for printing reports and data from system 6. Train designated staff members on use of new system 7. Provide minimum 1 year warranty on parts and labor