Bids are requested for leveling/resurfacing, striping and shoulder grading of approximately 10.03 miles/20-21 ft. wide of county roads. The installation of 9 rumble strips is also included. The roads to be resurfaced include Henry Moxley Rd., Campground Rd., D D Durrence Rd., Albert Rahn Rd., D L Durrence Rd., (at 2 locations) and Ted Kicklighter Rd. Leveling will also be required on portions of D L Durrence Rd. and Ted Kicklighter Rd. at marked areas. Leveling to be done with 1½”/165 lbs. per sq. yd. of Recycled ASPH Conc. Leveling, Incl Bitum. Material & H Lime. Roads are to be Resurfaced with 1½”/165 lbs. per sq.yd. of Recycled ASPH Conc. 12.5mm Super pave GP 2 only, Incl. Bitum Material & H Lime. Apply tack coat between leveling/existing surface and topping. Contractor is required to use a shuttle buggy for resurfacing on all roads. No Deep Base Patching is required. Shoulder grading to include clipping shoulders prior to resurfacing, and tilling/building shoulders to match resurfaced pavement. Additional material is to be added If grade from edge of pavement to edge of shoulder exceeds 5%. Stripe with solid white line on edge and solid/skip double yellow line in the center with 24” stop bars at each intersection. “High Build Paint” per GDOT specification “652 – Painting Traffic Stripe” is to be used for striping. Centerline is to be marked with temporary tape or striping between resurfacing and final striping. A certification from the striping contractor verifying material and placement specifications will be required. The contractor is responsible for placing low shoulder and advanced warning signs. The contractor will be responsible for providing material pits for shoulder grading if needed. The contractor will be given a 14 day notice to proceed.