Sealed bids for furnishing all materials, labor, tools, skills, equipment, and miscellaneous items necessary for the construction of the FY2026 WATER SYSTEM IMPROVEMENTS  RFB-26-52600 located in Cobb County, Georgia will be received by the BOARD OF LIGHTS AND WATER (BLW), a subsidiary corporation of the CITY OF MARIETTA, GEORGIA, herein referred to as the Owner, at the Purchasing Division, Marietta City Hall, 205 Lawrence Street, Marietta, GA 30060 until:
Monday, October 20th, 2025, 10:00 A.M., Local Time
Bids will be publicly opened and read aloud at this time and location. Bids received after said time and date will not be considered by Owner and will be returned unopened.
The approximate extent and character of the Work is generally described as follows:
The project includes the installation of approximately 1,110 LF of new 6-inch and 8-inch ductile iron water main along portions of Kennesaw Avenue and Chowning Place, and the replacement of approximately 8,900 LF of existing 8-inch, 6-inch, and 2-inch water mains along N Saint Mary’s Ln, Saint Mary’s Ln, Saint Annes Rd, Oakton Terrace, Saint John’s Ct, and Saint Teresa Terrace with new 6-inch and 8-inch ductile iron pipe. Work will be completed by open cut and jack and bore methods and will include valves, hydrants, appurtenances, and abandonment of existing mains for a complete water system. Project alternatives include full road width milling and repaving of Chowning Place as well as brick paver restoration at the entrance to Chowning Place. Construction will begin after January 1, 2026.