Specifications include, but are not limited to: The City of Palm Coast Wastewater Treatment Facility No.2 Expansion. Construction of WWTP No.2 expansion from 2.0 MGD to 4.0 MGD will generally include but is not limited to the following components: (a). Headworks – grit removal, drum screen; and odor control; (b). Flow equalization tanks with aeration and mixing equipment and flow equalization pumping system; (c). AWT biological treatment process using MBR, including anaerobic basins, pre‐anoxic basins, aerobic basins, post‐anoxic basins and MBR basins; (d). Chlorine contact chambers; (e).Reclaimed water transfer pumps; (f). Sludge holding tanks and associated aeration and mixing system and pumping equipment; (g). Chemical feed systems for alum, Micro‐C, and sodium hypochlorite; (h). All the associated structural, electrical and control system to make the project completed as designed.