Specifications include, but are not limited to: 1. Be able to provide a minimum of one (1) survey crew to work exclusively on CRA project. 2. Be able to assign at least one Professional Surveyor and Mapper to supervise each group of no greater than five (5) field crews. 3. Be able to provide crew competent in topographic surveys, construction layout and as-built surveys. On occasion, limited hydrographic work may be required. The consultant shall be responsible for providing the necessary personnel, equipment and expertise to perform this task. Hydrographic survey personnel need not be full-time employees of the consultant but their utilization must be approved by the CRA, prior to any work being done on this project. 4. Survey needs to accurately depict rights of ways. 5. Elevation cross sections of 50 foot stationed intervals (10 feet spacing on pavement) need to be provided when topographic work is ordered. Right of way cross sections, need to include: Back of sidewalk, type and top of curb, gutter line, edge of pavement, centerline/median and intersection centerline.