Specifications include, but are not limited to: 1. Arch Creek Phase 1 and 2 Pump Stations: This task includes work on two (2) stormwater pump stations located at NE 18 Ave and NE143 St and NE 14 Ave and NE 144 St. Work includes the installation of three (3) telemetry sensors and integration into the existing SCADA system. 2. Belen Phase 1 and 2 Pump Stations: This task includes work on two (2) stormwater pump stations located at SW 127 Ave and SW 6 St and SW 120 Ave and SW 6 St. Work includes the installation of three (3) telemetry sensors and integration to the existing SCADA system, and installation of new louver windows with extraction capabilities in the pump control room at each pump station. 3. Rucks Park Stormwater Pump Station: This task includes work on one (1) stormwater pump station located at NE 4 Ave and NE 139 St. Work includes the installation of three (3) telemetry sensors and integration to existing SCADA system, installation of a new access door and new louver windows with extraction capabilities for the pump room, installation of a new louver door in the generator room, a new pump control panel, installation of a fixed swingable access door in the wet well trash interceptor, installation and automation of a new 60 inch sluice gate in the wet well with an actuator. 4. Pump Station at SW 87th Avenue and SW 2nd Street: This task includes work on one (1) stormwater pump station located at SW 87 Ave and SW 2 St. Work includes the installation of three (3) telemetry sensors and integration to existing SCADA system, installation, and automation of a new 24-inch sluice gate in the wet well with actuator.