SOURCES SOUGHT. THIS IS NOT A SOLICITATION FOR OFFERS OR BIDS AND IS USED STRICTLY FOR MARKET RESEARCH PURPOSES.
PLEASE EMAIL THE POC LISTED BELOW TO EXPRESS YOUR INTEREST AND/OR CAPABILITY TO ACCOMPLISH THE BELOW SCOPE OF WORK:
Complete the interior build out of B9678 weapons maintenance storage addition project that was descoped after exterior construction, fire alarm, fire suppression and partial HVAC was done. This project consists of interior finishes, lowering fire sprinkler heads to appropriate height of drop ceiling, locating fire alarm devices to actual locations, completing HVAC, removing temporary ductless split unit (return to CES), electrical & comm work, furniture and existing joint between old building and addition. Frame interior wall around window between addition and room 119 to preserve existing window. Exterior work includes raising existing transformer pad to include regrading, CMU infill and match existing exterior finishes, horizontal chain link fencing and gate at exterior, The original contract drawings have been annotated with dashed lines to show scope of work (grayed out information not in scope) and full project specifications are included.
IMPORTANT: This project will include both construction (CLIN 0001) and furniture (CLIN 0002).